7. Glennan Building
Built in 1968, Glennan houses the Electrical Engineering program and Mechanical and Aerospace Engineering department, along with an electronics supply store and two computer labs (Kern Lab and CAEL - Computer Aided Engineering Lab). Glennan is also home to the Center for Surface Analysis of Materials (CSAM).
|
|
8. Emerson Gym
Built in 1957 with recent additions, Emerson is the main athletic facility for the campus. It offers two olympic-sized swimming pools, a nautilus room, and free weight room, a bike room, a fencing room, an aerobics room, a wrestling room, a riflery range, and varsity, staff, and undergraduate locker rooms.
|
|
9. Veale Convocation Center
Completed in 1997 and directly connected to Emerson Gymnasium, the Veale Convocation, Athletic and Recreation Center is a 78,000-square-foot facility featuring new physical education facilities for cross-country, swimming, weight-lifting, and much more.
|
|
|
To the Next Stop
|